Technical re-equipment of the raw water supply scheme to the ultrafiltration unit (UFU) of the TPP TEC-5 chemical shop (Joint Venture “Kyivski TEC”)

Years of implementation2016–2017
Type of works

Design, equipment supply, installation, software development, commissioning

Equipment used; specifics of works provided

NK GRUNDFOS 37 kW pumps, LDM control valves RV212 DN400, pressure, flow, temperature and level sensors, heating of process pipelines 

Photo

Reconstruction of the water treatment scheme (LLC “Kremenchuk TEC”)

Years of implementation2016–2020
Type of works

Correction of project documentation, equipment supply, installation work, software development, commissioning

Equipment used; specifics of works provided

Construction and installation works: 

  • dismantling/installation of water storage tanks V=250m2; 
  • application of anti-corrosion coating; 
  • installation of insulation; 
  • piping of the equipment. 

Pumping equipment Installation (Grundfoss). A spectral analyzer of oil products, RTZO (current distribution gate equipment) cabinets, pump control cabinets based on Schneider Electric equipment 

Photo

Reconstruction of measuring sections for drinking water pipelines 3 and 4 threads (Ferrexpo Poltava Mining)

Year of implementation2017
Type of works

Installation and commissioning

Equipment used; specifics of works provided

Installation of measuring units on drinking water supply pipelines to the Poltava mining and processing plant D600mm and D700mm with the installation and integration of a water metering system into a company’s united networked ACS system

Implementation of the adjustable electric drive of the Coastal Pumping Station NDV at TPP TEC-6 (Joint Venture “Kyivski TEC”, Municipal Enterprise "Kyivteploenergo")

Year of implementation2019
Type of works

Adjustment of design and estimate documentation, installation works, software development, equipment supply, commissioning

Equipment used; specifics of works provided

TIS shut-off valves, ABO underwater shut-off valves, Grundfos pumps, Schneider Electric IF and PLC, Lapp Kabel cable products. Adjustment of project and estimate documentation and proposal of alternative technical solutions allowed the customer to save more than 20% of capital costs, namely 6.5 million hryvnias including VAT. During the installation work, underwater welding and industrial climbing work were carried out

Photo

Installation and commissioning of a set of equipment for water purification by reverse osmosis technology with a capacity of at least 16.6 m³/h at the facility "New construction of buildings and structures complex for grain storage and processing" of ENSELCO-AGRO LLC

Years of implementation2020–2021
Type of works

Installation and commissioning works

Equipment used; specifics of works provided

Installation and commissioning of the following equipment: 

  • PE tank 10m2; AZUD disk filter with flushing control controller; 
  • mechanical cleaning filter ECOSOFT FP3072; 
  • two-stage reverse osmosis desalination plant ECOSOFT MO; 
  • ECOSOFT CIP membrane chemical washing station; 
  • GRUNDFOS reagent dosing station complete with reagent tank and level sensor; 
  • GRUNDFOS pumps; 
  • flow meters E+H Prowil and a set of control devices; pipeline (PVC)
Photo

Installation of three water purification systems at the Customer's divisions, the Central Plant, the DMP, and the Pellets Production Workshop (TsVO) (Ferrexpo Poltava Mining)

Year of implementation

2021

Type of works

Installation and commissioning

Equipment used; specifics of works provided

Within the framework of the projects, it was installed water purification systems using reverse osmosis technology, automation and protection systems for pumping units has been installed

Dismantling and installation, manufacturing and installation of metal structures, construction works in accordance with the projects

Years of implementation2021–2022
Project title

Dismantling and installation, manufacturing and installation of metal structures, construction works in accordance with the projects: 

  • "Connection of the LH-35-8/300B unit to the BOV-3 recycling water supply network";
  • "Supply of cold and hot recycled water of the BOV-1 1st system to L 35-11/300";
  • "Fuel oil loading into tank trucks at the UZM overpass" of PJSC “Ukrtatnafta”, Kremenchuk
Type of works

Dismantling of existing equipment, manufacturing and installation of metal structures, construction works, installation of technological pipelines

Equipment used; specifics of works provided

Welding and assembly equipment, construction and lifting equipment. Installation of a process pipeline DN 400÷600, work at height

Construction of a water treatment plant at PJSC "POEZ-KERNEL GROUP" for the project implementation: "Reconstruction of the plant's steam supply system with the installation of 10.4 MW electric capacity cogeneration unit at PJSC "POEZ-KERNEL GROUP", address: 17 Marshala Biryuzova St., Poltava

Years of implementation2021–2022
Type of works

Installation and commissioning

Equipment used; specifics of works provided

Installation and commissioning of the following equipment:   

  • Grundfos pumping station with an automation cabinet with a frequency converter, 50m3/hour 
  • Organic FM 36-4 mechanical filtration system; 
  • ORP control and metabisulfite dosing system; 
  • antiscalant dosing system; 
  • Organic RO-20 reverse osmosis system; 
  • Organic reagent dosing system;
  • electrical conductivity control system; 
  • dosing system for anti-corrosion water treatment;
  • feed water quality control system; 
  • boiler water quality control system (salt compartment); 
  • water quality control system (production condensate); 
  • mechanical filter 10 m3; 
  • Organic RO-8 reverse osmosis system
Photo

Technical re-equipment of the wastewater treatment unit by applying the complex technology of membrane water treatment by reverse osmosis (PJSC “Ukrtatnafta”)

Year of implementation2022
Type of worksDevelopment of project documentation, installation, commissioning
Equipment used; specifics of works provided

To remove coarse impurities that can be carried away from the sedimentation tanks, a self-washing disc filter unit with a hydrocyclone effect with a maximum capacity of 225 m3/h, consisting of nine Azud Spin Clean filter flasks, is used before the ultrafiltration units. 

Two parallel Ecosoft MU-90 ultrafiltration units with a nominal capacity of 90 m3/h each are used to purify water from microorganisms, algae and colloidal impurities. One unit has 22 polyester ultrafiltration elements with a filtration area of 77 m2 each. The membrane module is a bundle of membrane capillaries with a pore size of 0.03 μm made of hydrophilized PVDF (H-PVDF) located inside a cylindrical housing.

The desalination unit consists of two parallel Ecosoft MO-60 reverse osmosis units with a rated capacity of 60 m3/h of permeate each in the inlet water temperature range of 15-25°C. Each unit is equipped with 60 low-pressure reverse osmosis membrane elements XLE440

Photo