Reconstruction of the 16 ATA steam supply scheme (LLC “Kremenchuk TEC”)

Years of implementation2018–2020
Type of works

Design, installation, equipment supply, software development, comprehensive testing and commissioning

Equipment used; specifics of works provided

Construction and installation works:

  • dismantling of existing equipment; 
  • installation of new steam pipelines P=16 ATA, T=3000C, category III, f530-f325 with subsequent NMC; 
  • installation of LDM control valves; 
  • installation of thermal insulation

Electronic control equipment and instrumentation. Replacing steam water heaters with electric ones (Ferrexpo Poltava Mining)

Year of implementation2017
Type of works

Installation and commissioning

Equipment used; specifics of works provided

Replacing and adjusting outdated water heating equipment with more efficient ones

SVL. Reconstruction of the steam supply at the diesel locomotive equipment department (PJSC "Poltava GZK")

Year of implementation2017
Type of works

Installation and commissioning works

Equipment used; specifics of works provided

Implementation of a project with the installation of an aqua distiller and an automatic control system to provide the locomotive equipment area with distilled water and water heating in the household premises with the implementation of repair and construction works, installation of an automation system

Modernization of automatic regulation and control of the of the water level control system for boilers No. 1–4 drums (LLC “Kremenchuk TEC”)

Years of implementation2018–2020
Type of worksDesign, installation, equipment supply, software development, comprehensive testing and commissioning
Equipment used; specifics of works provided

Our enterprise was the first in Ukraine to use the flagship Schneider Electric Modicon M580 controllers with hot redundancy. Installation of an LDM control valve for feed water Dy 225 RV701, with medium parameters: T = 230 ⁰C, P = 230 kgf/cm2 on welded joints with a wall thickness of 24 mm; installation of a feedwater and superheated steam flow sensor; the layout and assembly of the control cabinet was carried out by the company's specialists, based on Schneider Electric equipment

Photo

Reconstruction of the steam supply system of the diesel locomotive equipment section of the railway workshop (Ferrexpo Poltava Mining)

Year of implementation2019
Type of works

Installation and commissioning

Equipment used; specifics of works provided

Implementation of a project involving the installation of an aqua distiller and an automatic control system to provide the locomotive equipment area with distilled water and water heating in the household premises with the implementation of repair and construction works, installation of an automation system

Technical re-equipment of the system of automatic regulation (SAR) for the temperature of superheated steam control of TGM-84 boilers No. 1, No. 2, No. 3, No. 4 (LLC “Kremenchuk TEC”)

Years of implementation

2019–2020

Type of works

Design, installation, equipment supply, software development, comprehensive testing and commissioning

Equipment used; specifics of works provided

The automatic control system (ACS) for superheated steam temperature control of the TGM-84 boiler st. No. 1–4 includes:

  • cabinet of the automatic control system of the boiler K-1 (ACS K-1), SCS K-1, IP65, ~220/=24 V, 50 Hz In=25A, Ix=6 kA, order No. 15599;
  • cabinet of normal converters, ШПН-1, IP65, ~220/=24 V, 50 Hz I=4A, Ic=6 kA, serial No. 15590;
  • manual control unit, type BRK-10-3-3-3-0.75-24. Microl;
  • two-way pressure-relief control valve. Type number RV701 ERM 4151 RO complete with Regada ST(R)2 electric actuator (LDM, Regada);
  • temperature sensor "ТХА-ХА" – PST ТХА-002б-К-И2-160-Р3/-40..+800;
  • operator touch panel 12.1", SVGA-TFT, 24V, DC, art. HMIGTO6310, Schneider Electric.

Special conditions of work performance are: welding of elements (pipes, fittings, beans and valves ‘before’) of category I steam pipelines with operating parameters P=15.5 MPa, T=535°C from low-alloyed chromium-molybdenum steels (12Х1МФ).

Welding technology involves heat treatment of welded joints