Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the fuel oil economy FPNS MZH at TPP TEC-5 (Joint Venture “Kyivski TEC”)

Years of implementation2016-2017
Type of works

Technical re-equipment of 0.4 kV boards. Board of the fecal pumping station of the fuel oil economy FPNS MZH at TPP TEC-5 (Joint Venture “Kyivski TEC”)

Equipment used; specifics of works provided

Layout and assembly of a 0.4 kV power switchgear based on the Prisma P design and Schneider Electric equipment

Photo

  

Overhaul of the existing SPP with the installation of a new 85kVA diesel generator and installation of a backup power line to supply individual power receivers of the Zinkivsk Central Regional Hospital (Municipal non-commercial enterprise "Zinkivskyi Central Regional Hospital")

Year of implementation2017
Type of works

Design, installation, equipment supply, and commissioning

Equipment used; specifics of works provided

An automatic transfer switch system with automatic start and stop of the diesel generator was implemented.  A digital power quality analyzer Prova 6830a was used during the work.

Photo

CSP. Implementation of special automatic load disconnection (SALD) (Ferrexpo Poltava Mining)

Year of implementation2017
Type of works

Installation and commissioning

Equipment used; specifics of works provided

In the framework of the project, the installation and commissioning of the automatic load disconnection system based on the “Diamond” safety terminals at the feeder substation was carried out with the approval of NPC Ukrenergo

Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-2000-50 type and overhaul of the B-110 "Oseshchyna" circuit breaker of the B-110-2000-50 type at TPP TEC-6 (Joint Venture “Kyivski TEC”, JSC " Kyivenergo")

Year of implementation2017
Type of worksOverhaul of oil circuit breakers
Equipment used; specifics of works provided 
Photo

Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply (Ferrexpo Poltava Mining)

Year of implementation2018
Type of works

Installation and commissioning

Equipment used; specifics of works provided

From the very beginning, the project faced implementation difficulties due to the impossibility of decommissioning the pumping equipment due to the possibility of the station flooding. Qualified specialists of our company, under the conditions of tight deadlines and the threat of flooding, managed to organize a temporary power supply and replace the inlet switchgear, with the subsequent switching of all feeder consumers to it

Reconstruction of TP-33-1 (Ferrexpo Poltava Mining)

Year of implementation2018
Type of works

Construction, electrical installation and commissioning works

Equipment used; specifics of works provided

Works included the replacement of a two-transformer substation and a two-section 0.4 kV switchgear with automatic transfer switchboard, the construction part of which included finishing works on the premises, LED lighting, provision of a new automatic supply and exhaust ventilation and air conditioning system based on a liquid chiller and adjustable fan coils

Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line (Ferrexpo Poltava Mining)

Year of implementation2019
Type of works

Installation and commissioning

Equipment used; specifics of works provided

Ensuring uninterrupted power supply thanks to the implementation of the project with the introduction of UPS into the system in a short time

Transformer replacement at TP 17-2 (Ferrexpo Poltava Mining)

Year of implementation2019
Type of works

Design, installation, and commissioning

Equipment used; specifics of works provided

According to our own design, we quickly and efficiently replaced the transformer and 0.4 kV busbar, 6 kV input cable, and performed commissioning works

Installation of repair stations 220/380 V at OPU (Ferrexpo Poltava Mining)

Year of implementation2019
Type of works

Design, installation and commissioning

Equipment used; specifics of works provided

In the framework of the project, an autonomous system of repair stations with safety and disconnection systems is envisaged to ensure unimpeded connection of the necessary repair equipment to the power grid

Modernization of 0.4 kV switchgear at PNS-1 TSHG (Ferrexpo Poltava Mining)

Year of implementation2020
Type of worksInstallation, commissioning, project adjustment
Equipment used; specifics of works provided

The 2nd stage of the project was entrusted to our company's specialists due to the successful implementation of the 1st stage. Replacement of switchgears of two input sections MCC1 and MCC2, construction of cable routes in place of existing routes in the conditions of existing production, laying of switchgear and reconnection of all 0.4 kV mechanisms and 6 kV pumps, switching to a new local control system, preparatory work for the transfer of the station to a remote control system from a centralized control system

Transformer replacement at TP 16-2 (Ferrexpo Poltava Mining)

Year of implementation2020
Type of works

Design, installation, and commissioning

Equipment used; specifics of works provided

According to our own design, we quickly and efficiently replaced the transformer and 0.4 kV busbar, 6 kV input cable, and performed commissioning works

Transformer replacement at TP 15-2 (Ferrexpo Poltava Mining)

Year of implementation2022
Type of works

Design, installation and commissioning

Equipment used; specifics of works provided

Preparatory work

Transformer replacement at TP 14-2 (Ferrexpo Poltava Mining)

Year of implementation

2022

Type of works

Design, installation and commissioning

Equipment used; specifics of works provided

Preparatory work

Replacement of the 0.4 kV switchgear at TP TP 03-1 BRM (Ferrexpo Poltava Mining)

Year of implementation2022
Project title

Replacement of the 0.4 kV switchgear at TP TP 03-1 BRM (Ferrexpo Poltava Mining)

Type of worksInstallation and commissioning
Equipment used; specifics of works provided

In the framework of the project, general construction works were carried out to improve the substation premises with the installation of new cable entries, ventilation and heating systems, arrangement of underground cable routes using horizontal directional drilling technology, as well as a full range of dismantling and installation works of the main equipment with retrofit of cells at the main step-down substation with further adjustment of the entire equipment complex